You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
 
 
 

2.5 KiB

HANDOFF

Append-only role handoff log. Each role adds one entry when its step is complete.


T-001, T-002, T-003 — plan — 2026-10-12T10:58:09Z

Field Value
Agent claude
Summary Planned the laundry status service as three tasks: status logic and payload parsing, sampler/MQTT/HTTP/page, then Docker and README
Files Changed .ai/PLAN.md, .ai/TASKS.md, .ai/HANDOFF.md, ROADMAP.md
Next Role implement

T-001 — next_task (dev/all_task) — 2026-10-12T11:03:20Z

Field Value
Agent codex
Summary Added a three-sample ring, laundry state evaluation, and numeric Tasmota power parsing with tests first and package documentation
Validation fmt/vet/test PASS; E2E NOT_CONFIGURED; review PASS
Commit feat(status): evaluate laundry state from the last three power samples
Next Role dev commit

T-001 — commit_task (all_task) — 2026-10-12T11:03:56Z

  • Status: done. Commit message read from the T-001 next_task entry.
  • Included the existing roadmap and planning artifacts that define this cycle.

T-002 — next_task (dev/all_task) — 2026-10-12T11:17:06Z

Field Value
Agent codex
Summary Added continuous MQTT sampling, current-status API, responsive page, environment configuration, and graceful shutdown
Validation fmt/vet/test/race PASS; isolated MQTT and Chrome smoke PASS; review PASS
Commit feat(web): show live laundry status page fed by MQTT power readings
Next Role dev commit

T-002 — commit_task (all_task) — 2026-10-12T11:17:06Z

  • Status: done. Commit message read from the T-002 next_task entry.

T-003 — next_task (dev/all_task) — 2026-10-12T11:22:18Z

Field Value
Agent codex
Summary Added a static non-root Docker image, Compose configuration, build exclusions, and deployment/status documentation while preserving the AI Workflow section
Validation fmt/vet/test PASS; Docker build/runtime and Compose overrides PASS; review PASS
Commit feat(docker): package laundry status service with Docker and README
Next Role dev commit
  • PR limitation: aide pr --dry-run refuses main; the repository instructions require staying on the current branch.

T-003 — commit_task (all_task) — 2026-10-12T11:22:18Z

  • Status: done. Commit message read from the T-003 next_task entry.
  • All three tasks completed and reviewed; one separate Conventional Commit per task.